Research Article

Blasting Vibration Control Using an Improved Artificial Neural Network in the Ashele Copper Mine

Table 3

Measured and predicted PPV values for different models.

PredictorSite constantPPV (mm/s)
KBn12

USBM345.381.02119.37115.30
Langefors–Kihlstrom13.311.54146.94144.37
Bureau of Indian Standards13.310.77146.94144.37
Ambraseys–Hendron1100.461.15109.95105.70
CMRI predictor13.8646.29130.71127.88
GA-ANN55.6087.80
Measured56.2896.99