Research Article
Blast Liquefaction Test of Saturated Sand Foundations Disposed by a Drainage Rigid Pile
Figure 1
Site set-up scheme. (a) Number and location of the fracturing vessel, (b) site dimensions and equipment layout, and (c) schematic diagram of the actual vessel location onsite.
(a) |
(b) |
(c) |