Research Article

Blast Liquefaction Test of Saturated Sand Foundations Disposed by a Drainage Rigid Pile

Figure 1

Site set-up scheme. (a) Number and location of the fracturing vessel, (b) site dimensions and equipment layout, and (c) schematic diagram of the actual vessel location onsite.
(a)
(b)
(c)