Research Article
Intelligent Drilling Depth Monitoring System for Geotechnical Site Investigation
Table 1
Comparison of drillhole depth calculation in two methods.
| Coring category | Drilling serial number | Test monitoring depth (m) | Number of drill pipes calculated depth (m) |
| Soil sample | ZK 1 | 29.63 | 29.91 | ZK 2 | 31.13 | 31.39 | ZK 3 | 29.64 | 29.89 | ZK 4 | 34.70 | 34.96 |
|
|