Research Article

Study on Construction and Optimization of the Life-Saving Passage in Building Ruins Based on Numerical Simulation Method

Figure 19

Timing test of rescue technologies (Site: USAR training center, 2020–2022): (a) timing tests of removal rescue technology, (b) timing tests of shoring rescue technology, (c) timing tests of uplift rescue technology, (d) timing tests of breach recuse technology, (e) timing tests of treating the wound, and (f) timing tests of transporting trapped people.
(a)
(b)
(c)
(d)
(e)
(f)