Research Article

Study on Construction and Optimization of the Life-Saving Passage in Building Ruins Based on Numerical Simulation Method

Figure 9

(a) Breaching and removing the infilled wall elements, (b) breaching and removing the first slab elements, (c) breaching and removing the second slab elements, and (d) uplifting and shoring the slab.