Research Article
Study on Construction and Optimization of the Life-Saving Passage in Building Ruins Based on Numerical Simulation Method
Table 3
Timing test of shoring rescue technology.
| No | Equipment type | Shoring type | Shoring height (mm) | Number of testers | Proficiency | Average time T |
| 1 | Drama, claw hammer, handsaw, and consumables | Door and window wood shoring | 1800 | 4 | Skilled | 28′32″ | 2 | Unskilled | 40′11″ | 3 | 2400 | Skilled | 31′16″ | 4 | Unskilled | 52′36″ | 5 | 3600 | Skilled | 44′48″ | 6 | Unskilled | 60′37″ | 7 | Double column wood shoring | 1800 | 4 | Skilled | 60′55″ | 8 | Unskilled | 81′23″ | 9 | 2400 | Skilled | 73′07″ | 10 | Unskilled | 94′03″ | 11 | 3600 | Skilled | 88′34″ | 12 | Unskilled | 102′16″ | 13 | L-type wood shoring | 1800 | 4 | Skilled | 66′30″ | 14 | Unskilled | 96′31″ | 15 | 2400 | Skilled | 67′22″ | 16 | Unskilled | 99′58″ | 17 | 3D wood shoring | 1800 | 4 | Skilled | 155′44″ | 18 | Unskilled | 189′02″ | 19 | 2400 | Skilled | 160′19″ | 20 | Unskilled | 199′32″ | 21 | 3600 | Skilled | 187′08″ | 22 | Unskilled | 220′51″ |
|
|