Research Article

Study on Construction and Optimization of the Life-Saving Passage in Building Ruins Based on Numerical Simulation Method

Table 6

Rescue time of horizontal and vertical life-saving passages (proficiency: unskilled).

Life-saving passageRemoval time T1iBreach time T2iShoring time T3iUplift time T4iTreatment time T5iTransporting timeTotal rescue time T

VerticalT 11T 12T 13T 21T 22T 31T 32T 41T 5T 6671′23″
18′06″22′11″22′11″126′50″126′50″189′02″40′11″41′02″45′40′

HorizontalT 11T 12T 13T 21T 22T 31T 32T 41T 5T 6524′12″
18′06″18′06″22′11″55′17″55′17″189′02″40′11″41′02″45′40′