Study on Construction and Optimization of the Life-Saving Passage in Building Ruins Based on Numerical Simulation Method
Table 6
Rescue time of horizontal and vertical life-saving passages (proficiency: unskilled).
| Life-saving passage | Removal time T1i | Breach time T2i | Shoring time T3i | Uplift time T4i | Treatment time T5i | Transporting time | Total rescue time T |
| Vertical | T 11 | T 12 | T 13 | T 21 | T 22 | T 31 | T 32 | T 41 | T 5 | T 6 | 671′23″ | 18′06″ | 22′11″ | 22′11″ | 126′50″ | 126′50″ | 189′02″ | 40′11″ | 41′02″ | 45′ | 40′ |
| Horizontal | T 11 | T 12 | T 13 | T 21 | T 22 | T 31 | T 32 | T 41 | T 5 | T 6 | 524′12″ | 18′06″ | 18′06″ | 22′11″ | 55′17″ | 55′17″ | 189′02″ | 40′11″ | 41′02″ | 45′ | 40′ |
|
|