Study on Construction and Optimization of the Life-Saving Passage in Building Ruins Based on Numerical Simulation Method

Table 7

Rescue time of horizontal and vertical life-saving passages (proficiency: skilled).

Life-saving passageRemoval time T1iBreach time T2iShoring time T3iUplift time T4iTreatment time T5iTransporting timeTotal rescue time T

VerticalT11T12T13T21T22T31T32T41T5T6528′17″
18′06″22′11″22′11″81′33″81′33″155′44″28′32″33′27″45′40′

HorizontalT11T12T13T21T22T31T32T41T5T6451′16″
18′06″18′06″22′11″45′05″45′05″155′44″28′32″33′27″45′40′