Research Article

Qualitative Evaluation of Project P.A.T.H.S.: An Integration of Findings Based on Program Participants

Table 1

Description of data characteristics from 2005 to 2009.

2005/06 (EIP-S1)2006/07 (FIP-S1)2007/08 (FIP-S2)2007/08 (EIP-S3)

Total schools that joined P.A.T.H.S.5220719648
 (i) 10 h program239511329
 (ii) 20 h program291128319
Total schools that joined this study410104
  (i) 10 h program1220
  (ii) 20 h program3884
    (a) No. of schools incorporated into formal curriculum3484
    (b) No. of schools incorporated into class teacher’s period and
   other time slots
1620
Average no. (range) of classes per school5 (5)4.9 (3–6)4.9 (3–6)4.8 (4–6)
No. of student focus groups5a10104
Total student respondents43889229
Average no. (range) of respondents per group8.6 (3–10)8.8 (4–12)9.2 (4–11)7.3 (3–10)

Note: EIP = experimental implementation phase, FIP = full implementation phase, S1: Secondary 1 level; S2: Secondary 2 level; S3: Secondary 3 level.
aEleven students in a school were divided into two focus groups.