Research Article
Electricity Load Forecasting Using Support Vector Regression with Memetic Algorithms
Table 1
Performance metrics and their formulas in regression problems.
| ||||||||||||||
ā is the number of forecasting periods, is the actual value at period , is the forecasting value at period , and is the mean of all values. In this study, the day-ahead (24 hours) short-term load is forecasted recursively, so the number of forecasting periods N equals 24. |