Research Article

Electricity Load Forecasting Using Support Vector Regression with Memetic Algorithms

Table 4

MASE of SVR model with different parameter determination methods.

PeriodFA-MAFAGAPSOSA

April0.330.380.440.470.51
May0.370.430.500.530.51
June0.410.480.480.500.56
ALL0.370.420.470.500.53