Research Article

Study on the Application of the Kent Index Method on the Risk Assessment of Disastrous Accidents in Subway Engineering

Table 4

Basic introduction of the tunnel.

Tunnel mileageK11 + 251–K14 + 857
Tunnel designSingle tunnel, double track
Tunnel diameter (outer/inner)11.2/10.2
Tunnel buried depth5 m to 35 m
Shield typeSlurry shield
Stratum silt layer, fine sand; 4-4e1 round gravel layer
Depth of river0 m to 25.5 m
Permeability coefficient5.43 × 10−7 to 8.87 × 10−4 cm · s