Research Article

Emergy Evaluation of a Production and Utilization Process of Irrigation Water in China

Table 4

Emergy evaluation of the integrated system of irrigation water production and irrigated agriculturea.

Number ItemRaw dataSolar transformitybSolar emergy

Renewable resources (R) sej/year
1Sunlight J/year sej/J sej/year
2Wind, kinetic energy J/year sej/J sej/year
3Rain, geopotential J/year sej/J sej/year
4Rain, chemical J/year sej/J sej/year
5Water taken from the local river J/year sej/Jc sej/year

Nonrenewable resources (N) sej/year
6Net top soil loss J/year sej/J sej/year
7Soil g/year sej/g sej/year
8Water used by cement J/year sej/Jc sej/year

Materials (M) sej/year
9Cement g/year sej/gd sej/year
10Sand g/year sej/gd sej/year
11Stone g/year sej/gd sej/year
12Steel g/year sej/gd sej/year
13Brick g/year sej/gd sej/year
14Machinery $/year sej/$ sej/year
15Temporary works $/year sej/$ sej/year
16Electricity J/year sej/J sej/year
17Nitrogenous fertilizer g/year sej/g sej/year
18Phosphate fertilizer g/year sej/g sej/year
19Compound fertilizer g/year sej/ge sej/year
20Pesticide g/year sej/g sej/year
21Hybrid seeds g/year sej/g sej/year

Services (S) sej/year
22Labor $/year sej/$f sej/year
23Other costs (e.g., construction management and production preparation) $/year sej/$f sej/year
24Maintenance $/year sej/$f sej/year
25Leasing operating costs $/year sej/$f sej/year
26Agricultural technology service $/year sej/$f sej/year
27Pumping water services $/year sej/$f sej/year

Total emergy yield (Y) sej/year

Output (O)
28Rice J/year sej/Jg sej/year

Data sources and calculations are given in Appendix . For the methods of energy transformation, refer to [25].
Transformitiesfrom [25, 27].
Assumed the same as that of the Yangtze river [24].
Transformities from [52].
Transformity from [28].
The emergy/dollar ratio of Chinese economy 2002 is from [24].
Calculated in this study.