SEM-PLS Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia: Perspective of Clients and Consultants
Table 1
Characteristics of the respondents.
| Characteristic | Frequency | Percentage | Cumulative percentage |
| Experience | | | | 0–5 Years | 23 | 16 | 16 | 6–10 Years | 23 | 16 | 32 | 11–15 Years | 30 | 20.8 | 52.8 | 16–20 Years | 15 | 10.4 | 63.2 | >20 Years | 53 | 36.8 | 100 | Education Level | | | | BE | 110 | 76.4 | 76.4 | BSc | 8 | 5.6 | 81.9 | Diploma | 3 | 2.1 | 84.0 | MBA | 1 | 0.7 | 84.7 | ME | 3 | 2.1 | 86.8 | MSc | 17 | 11.8 | 98.6 | PhD | 2 | 1.4 | 100 | Working Position | | | | Executives (directors) | 50 | 34.72 | 34.72 | Managerial personnel | 35 | 24.31 | 59.03 | Engineering staff | 54 | 37.50 | 96.53 | Quantity surveying personnel | 5 | 3.47 | 100 |
|
|