Research Article

Time-Lapse Electrical Resistivity Investigations for Imaging the Grouting Injection in Shallow Subsurface Cavities

Table 1

Time-lapse electrical resistivity monitoring and amount of grouting material.

PhaseElectrical resistivity measurement Injection conditionAmount of grouting material (m3)

Phase 1 (pregrouting)Lines 1–8Pregrouting0
Phase 2 (during grouting)Lines 4 and 6During grouting105
Phase 3 (during grouting)Lines 4 and 6During grouting325
Phase 4 (during grouting)Lines 4 and 6During grouting186
Phase 5 (postgrouting)Lines 1–8Postgrouting

Total = 616 m3