Research Article

Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station

Figure 11

Excavation sequence of the pilot heading.
275362.fig.0011a
(a) Cross section
275362.fig.0011b
(b) Longitudinal section