Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

Table 10

Sensitivity analysis on optimistic-pessimistic index and probability-possibility levels.

Objective

0.00 0.32690.32300.31800.33210.32770.32250.33730.33020.32710.34150.33640.3315
0.25 0.34080.33640.33270.34370.33930.33580.34620.34270.33920.34850.34550.3418
0.50 0.35020.34710.35080.35020.34710.35080.35020.34710.35080.35020.34710.3508
0.75 0.36030.36450.36840.35720.36130.36480.35500.35870.36200.35310.35620.3597
1.00 0.37100.37630.38160.36850.37350.37710.36630.37000.37420.36370.36750.3708