Research Article

Ant Colony Optimization Analysis on Overall Stability of High Arch Dam Basis of Field Monitoring

Figure 6

Principal stress vector contour of upstream/downstream surface under analysis case 2: (a) upstream surface; (b) downstream surface.
483243.fig.006a
(a)
483243.fig.006b
(b)