Research Article

Ant Colony Optimization Analysis on Overall Stability of High Arch Dam Basis of Field Monitoring

Table 3

Field monitored displacement values and numerical results for solving the objective function .

Monitoring pointEL (m)Dam monolithDisplacement of case  3 (mm)Displacement of case  2 (mm)
MonitoringNumerical simulationMonitoringNumerical simulation

22150Number 6 19.5217.7524.3325.1
32114Number 615.6415.0517.7118.6
42087Number 67.2910.758.4512.2
52150Number 1125.5323.733.4238
62114Number 1126.842429.7432
72087Number 1122.222022.8725
82059Number 1113.651415.3016
92035Number 118.187.88.748.8
102150Number 1612.9119.114.0525.8
112114Number 1612.2014.215.3217.1
122087Number 168.088.39.059.3