Fuzzy Mixed Assembly Line Sequencing and Scheduling Optimization Model Using Multiobjective Dynamic Fuzzy GA

Table 9

Summary of the final results based on existing and optimized data.

ā€‰Existing dataOptimized data
ā€‰(Opt., Med., Pes.)(Opt., Med., Pes.)

Total scheduling time(166, 250, 266)(62.5, 73, 88.5)
Total setup number (No.)(44, 44, 44)(37, 37, 39)
Total efficient frontiers(105, 147, 155)(49.25, 54.5, 63.75)
Total scheduling time with setup time(254, 338, 354)(135, 145, 168)
Total operation setup time(88, 88, 88)(72, 72, 78)
Total changing setup cost ($)(3520, 3520, 3520)(2880, 2880, 3120)
Total units produced per day(2.89, 1.92, 1.80)(7.62, 6.58, 5.33)
Total efficiency (%)(11.45%, 10.32%, 10.90%)(30.16%, 35.34%, 32.22%)
Total idle time (%)(88.55%, 89.68%, 89.10%)(69.84%, 64.66%, 67.78%)