Research Article

An Optimal Hierarchical Decision Model for a Regional Logistics Network with Environmental Impact Consideration

Table 4

The operator parameters on logistics node.

Potential logistics parkGeneral node

Logistics node 3457 ( )
Economy of scale factor ρ0.90.90.90.91.0
Capacity (tons/week)120010001000800150
Fixed construction cost per unit area of logistics node ($/m2)0.5330.5330.5330.5330.533
Variable cost per unit of shipment ($/ton)0.220.180.20.20.35