Research Article

A Three-Stage Birandom Program for Unit Commitment with Wind Power Uncertainty

Table 7

Simulation results of the test case.

ā€‰Optimal objective value ($)Simulated expected total costs ($)Solution time (sec.)

Two-stage stochastic UC1202576.931202571.29183
Three-stage birandom UC1197628.571197602.478632
Cost savings4948.364968.82ā€‰