Research Article

Operation of a Wind Turbine-Flywheel Energy Storage System under Conditions of Stochastic Change of Wind Energy

Table 2

(a) List of statistical and power parameters determined for the course of wind velocity changes in 2010 (Enercon E 53 turbine,  m,  kW, and  s). (b) List of statistical and power parameters determined for the course of wind velocity changes in 2010 (Enercon E 53 turbine,  m,  kW, and  s).
(a)

Period  s  s  
DaysMWh/%MWh%MWh%

1 Jan. 2010–31 Mar. 201090397,010059,214,9337,885,1114,1136,014,7
1 June 2010–31 Aug. 201092256,410089,835,0166,765,0119,3143,817,9
1 Jan. 2010–31 Dec. 20103651501,6100314,721,01186,879,0121,4138,917,6

(b)

Period  kW  kW  kW
h%h%h%h%

1 Jan. 2010–31 Mar. 20102160100585,227,1916,142,4658,730,562,4514,0251,4
1 June 2010–31 Aug. 20102208100221,810,01559,170,6427,119,355,4398,4129,2
1 Jan. 2010–31 Dec. 201087601001197,913,75083,458,02478,728,359,6482,3197,9