Research Article

Operation of a Wind Turbine-Flywheel Energy Storage System under Conditions of Stochastic Change of Wind Energy

Table 3

(a) List of statistical and power parameters determined for the course of wind velocity changes in 2010 (Enercon E 53 turbine,  m,  kW, and  s). (b) List of statistical and power parameters determined for the course of wind velocity changes in 2010 (Enercon E 53 turbine,  m,  kW, and  s).
(a)

Period  s  s  
DaysMWh/%MWh%MWh%

1 Jan. 2010–31 Mar. 201090397,010098,224,7298,875,3114,1137,415,4
1 June 2010–31 Aug. 201092256,4100131,351,2125,248,8119,3146,523,0
1 Jan. 2010–31 Dec. 20103651501,6100487,932,51013,667,5121,4141,520,8

(b)

Period  kW  kW  kW
h%h%h%h%

1 Jan. 2010–31 Mar. 20102160100585,227,11075,149,8499,723,189,3602,0251,4
1 June 2010–31 Aug. 20102208100221,810,01729,778,3256,511,673,7503,2129,2
1 Jan. 2010–31 Dec. 20108761001197,913,75789,966,11772,220,281,8579,1197,9

The calculations use the power curve and other E53 turbine parameters presented in the manufacturer's technical catalogue [19].