Research Article
Hydrological Modeling of the Jiaoyi Watershed (China) Using HSPF Model
Table 5
Relative error analysis for monthly mean flow data in calibration period in the Jiaoyi watershed (2001–2004).
| Month | Observed (m3/s) | Simulated (m3/s) | RE (%) |
| 1 | 4.15 | 4.31 | 3.90 | 2 | 3.56 | 2.78 | −22.02 | 3 | 2.68 | 1.50 | −44.03 | 4 | 2.90 | 0.43 | −85.35 | 5 | 3.93 | 2.33 | −40.78 | 6 | 6.24 | 6.43 | 2.96 | 7 | 57.28 | 61.78 | 7.84 | 8 | 75.77 | 75.55 | −0.30 | 9 | 57.06 | 55.48 | −2.77 | 10 | 20.06 | 16.33 | −18.60 | 11 | 12.00 | 11.18 | −6.90 | 12 | 8.82 | 8.53 | −3.33 |
|
|