Research Article

Study on Noise Prediction Model and Control Schemes for Substation

Table 1

Lanchow 330 kV substation noise control plan.

ItemsConstitutionSound power level before noise reductionSound power level after noise reductionService condition

Plan AFirewallsTransformer 99 dBA 
Reactor 85 dBA
Transformer 99 dBA
Reactor 85 dBA
Conventional design
Plan BPlan A + reactor Box-in techniqueTransformer 99 dBA
Reactor 85 dBA
Transformer 99 dBA
Reactor 70 dBA
HVDC station and substation have begun to practice
Plan CPlan A + transformer Box-in techniqueTransformer 99 dBA
Reactor 85 dBA
Transformer 84 dBA
Reactor 85 dBA
HVDC station has begun to practice, substation has not been applied
Plan DPlan B + transformer Box-in techniqueTransformer 99 dBA
Reactor 85 dBA
Transformer 84 dBA
Reactor 70 dBA
HVDC station has begun to practice, substation has not been applied

HVDC station: high voltage direct current transmission substation.