Research Article

A Heuristic for Disassembly Planning in Remanufacturing System

Table 5

Production rate and setup time of operations .

Operation12345678910111213

V 5025100257550252025105010025
V 0.150.050.100.200.150.050.150.050.010.050.100.150.15
W 402525406070454010090557065
W 0.200.150.100.200.100.200.050.200.150.150.200.050.05