Research Article

A Heuristic for Disassembly Planning in Remanufacturing System

Table 6

Performance results of heuristic.

Cost structureNumber of optimal solutionAvgerage computation time (sec)Deviation from OPL solution
OPLHeuristic
Average optimalAverage total OptimalAllOptimalAll

A, V71183.9Over 6983.157.8156.60.96%3.32%0.74%2.45%
A, W6675.1Over 7223.9107.5252.83.00%2.09%3.04%1.73%
B, V7916.5Over 23246.995.2376.72.30%4.39%1.44%3.25%
B, W1020653Over 27045185.9820.71.14%1.97%0.87%1.43%