Research Article
A Heuristic for Disassembly Planning in Remanufacturing System
Table 7
Average objective function costs by OPL and heuristic.
(a) |
| | MIP | | | | | | |
| A, V | 5658.4 | 6842.5 | 6645.8 | 4451.1 | 23597.8 | A, W | 5450.5 | 6214.0 | 7387.1 | 4702.6 | 23754.2 | B, V | 32158.1 | 6915.5 | 13451.7 | 6877.4 | 59402.7 | B, W | 34654.5 | 5677.2 | 13542.4 | 6150.3 | 60024.4 |
|
|
(b) |
| | | | | | | | |
| A, V | 7726.2 | 4102.4 | 6699.3 | 5120.8 | 23648.7 | A, W | 9451.2 | 4412.3 | 5673.1 | 4672.4 | 24208.9 | B, V | 34248.6 | 5052.0 | 17536.1 | 4765.6 | 61602.4 | B, W | 35975.2 | 5735.0 | 14196.5 | 5471.9 | 61378.5 |
|
|
(c) |
| | | | | | | | |
| A, V | 6314.5 | 6712.9 | 6513.1 | 4731.3 | 24271.8 | A, W | 5578.0 | 6325.3 | 7392.2 | 4825.8 | 24121.3 | B, V | 32574.5 | 6937.8 | 14782.9 | 6925.6 | 61220.9 | B, W | 35112.1 | 5752.3 | 13945.9 | 6184.2 | 60994.5 |
|
|
: production cost, : holding cost, : setup cost, : purchasing cost, and : total cost.
|