The Scientific World Journal / 2015 / Article / Tab 3

Research Article

Optimal Pipe Size Design for Looped Irrigation Water Supply System Using Harmony Search: Saemangeum Project Area

Table 3

Decision variables and number of possible solutions for the target water supply network.

Target water supply networkNumber of water supply network decision variables in the initial design Total length of the pipelineNumber of possible solutions

Six zones of Saemangeum (loop type)35640,440 m18356    

We are committed to sharing findings related to COVID-19 as quickly as possible. We will be providing unlimited waivers of publication charges for accepted research articles as well as case reports and case series related to COVID-19. Review articles are excluded from this waiver policy. Sign up here as a reviewer to help fast-track new submissions.