|
notation | definition |
|
| number of repetitions of |
| subcarrier indication of |
| number of RUs of |
| modulation and coding scheme of |
| set of allocated subcarriers of |
| uplink request of (bits) |
| required transmission reliability of |
| delay constraint of (ms) |
| data arrival time of (ms) |
| transmit power of |
| maximum transmit power of |
| RU type of |
| received signal-to-noise ratio of (dB) |
| received power |
| transmitter gain of |
| receiver gain of |
| path loss between and the eNB |
| subcarrier bandwidth of the NB-IoT (Hz) |
| noise power |
| interference perceived at the eNB |
| bit-error-rate of |
| SNR threshold (dB) |
| data rate of (bits per subcarrier slot) |
| successful probability of data transmission of |
| DCI subframe index of (ms) |
| index of current scheduling subframe (ms) |
| feasible subcarrier set |
| index of earliest available subframe of subcarrier |
| allocation start time of RU of (ms) |
| number of slots for a single RU of |
|
notations of the proposed scheme | definition |
|
| feasible setting pairs of RU type and MCS of |
| score value of |
, | weighting factors |
| urgent level of ’s request |
| remaining time of ’s request from the scheduling subframe (ms) to the delay deadline |
| potential waste of with its allocated subcarrier set |
| earliest available allocation subframe (ms) of RUs for subcarrier |
| best subcarrier of |
| cost ratio of |
| number of choices of RU types |
|