Abstract

Vehicle-borne battery condition is an important factor affecting the efficiency of the maglev train operation and other connected ones. To effectively eliminate the influence of the battery condition and improve the operation efficiency of the connected maglev trains, an operation control strategy is proposed to guarantee train operation safety. First, based on Internet of Things, a sensor network is designed to monitor vehicle-borne battery condition in each vehicle of the train. Second, the train Operation Control System collects battery data of all vehicles in a maglev train by Train Communication Network. Third, all connected maglev trains share the battery data via a 38 GHz directional Radio Communication System and adjust operation control strategy accordingly. Simulation results indicate that the proposed strategy can guarantee the operation safety of the connected maglev trains.

1. Introduction

After the introduction of high-speed maglev train Transrapid-08 into Shanghai in 2002 and with the operations of both Airport Line of Changsha in 2016 and S1 Line of Beijing in 2017, maglev transportation system has received more and more attention in China [1, 2]. Compared with the conventional wheel-rail transportation systems, the maglev transportation system has many excellent features such as low environmental noise, small turning radius, high climbing slope ability, strong weather resistance, low maintenance cost, and long life-span [3].

Normally, based on five speed curve limits including the minimum speed-up limit, the minimum levitation limit, the maximum safety braking limit, the maximum speed running limit, and the maximum speed limit, the train Operation Control System (OCS), which has four subsystems including Central Control System (CCS), Decentralization Control System (DCS), Vehicle Control System (VCS), and 38 GHz directional Radio Communication System (RCS), formulates an operation control strategy real-timely to guarantee train operation safety [4].

However, for construction cost consideration, only station decentralizations and Auxiliary Stopping Area (ASA) of section decentralizations are equipped with Power Rail (PR), making it discontinuous. In case of emergency, VCS requests DCS to shut off the Propulsion Power-Supply System (PPS) and then the train-borne batteries are the only energy source for all train-borne electrical equipment to keep the train running to the next ASA. Unfortunately, the train cannot run again after it stops in the track without PR [5].

In the routine operation, the running speed is around 200 km/h for the medium-speed train and about 400 km/h for the high-speed train; the Vehicle Electrical Grid (VEG) is supplied by the vehicle-borne linear generator because of high power-generating efficiency at high speed. However, when the train speed decreases to 100 km/h or lower, the power-generating capacity of the linear generator drops too much to supply enough power to VEG. In this case, the train-borne batteries provide supplementary energy to VEG. For safety, during pull-in and departure station, the train speed is relatively low (lower than 100 km/h); VEG has to depend on the train-borne batteries. Hence, the battery conditions, especially the remaining capacity, are crucial to the train operation safety.

When the maglev train stops in the station or ASA in the section decentralization, vehicle-borne collectors will charge batteries through PR and the vehicle-borne batteries are in the high current mode, resulting in performance degradation easily. Therefore, it is of great significance to monitor the battery condition to prolong the battery life [6, 7] and adjust the operation strategy dynamically. Moreover, during the following operation for the connected trains, the following train has to adjust the operation control strategy in real-time according to both its self-condition and that of the leading one to prevent it from crashing.

In these years, with the rapid development of wireless communication and network technique, a wide range of Internet of Things (IoT) applications has been found in many areas such as smart cities [8], spatial crowdsourcing [9], and crowd dynamics management [10]. IoT is expected to achieve intelligent information processing, pervasive sensing, and efficient resource management in sensor network [1114].

The Train Communication Network (TCN) standard was approved by the International Electrotechnical Commission (IEC) and the IEEE in 1999 to warrant interoperability of train and equipment. TCN encompasses two serial master-slave buses: the Wire Train Bus (WTB) and the Multifunction Vehicle Bus (MVB). Nowadays, TCN is widely used in high-speed rail trains and metro trains [1519].

Recently, several fault detection methods have been presented to enhance the safety of the maglev train. A Bayesian network based detection method has been conducted [20, 21] to investigate acceleration sensor failures and analyse the multistate of the braking system. For maglev train, a risk modelling method of the failure event tree is given to detect the failure of levitation control system in [22].

In this paper, using IoT, a sensor network architecture is designed to monitor the vehicle-borne battery condition data in each vehicle; all these data in the train are collected by OCS through TCN and connected trains share them via RCS. Further, a new operation control strategy is proposed to guarantee the safety of the following operation for the connected maglev trains.

The main contributions of this paper are as follows.

For existing operation control strategies, it is assumed that the train-borne batteries have full capacity all the time. The proposed operation control strategy regards the battery conditions as variable states and formulates strategy in real-time according to the conditions of the batteries.

Comparing with existing operation control strategies, the proposed strategy takes other connected trains into consideration and adjusts the operation control strategy dynamically.

The rest of this paper is organized as follows. In Section 2, we analyse main resistance and energy consumption of the maglev train briefly. Section 3 is dedicated to designing a sensor network for the connected maglev trains to monitor battery conditions and exchange related information. In Section 4, based on battery condition data, an operation control strategy is proposed to guarantee the train safety in both station and section decentralizations. Section 5 is devoted to the simulation evaluation of the proposed scheme. Finally, conclusions are presented in Section 6.

2. Dynamic Analysis of the Maglev Train

Generally, the maglev train can be regarded as a rigid body when we study the operation control strategy. The total resistance mainly comes from the air, rail line, magnetic force, eddy current braking force, and other additional forces. The total resistance (unit is KN, the same below) can be described aswhere is the air resistance, is the magnetic resistance, is the eddy current braking resistance, is the linear motor braking resistance, is the gliding skid braking resistance, is the curve resistance, and is the gradient resistance.

The intrinsic resistance includes air resistance and intrinsic magnetic resistance [11]. Without considering the wind condition, the air resistance and magnetic resistance are given bywhere is the number of train vehicles and is the train speed.

For the maglev train, the braking force is mainly from the reverse braking, the resistance braking, the eddy current braking, the wearing plate braking, and the gliding skid braking.

Normally, the linear motor makes maglev train slow down by reverse braking and energy consume braking. The braking force is given as

In case of emergency, VSC sends blocking propulsion power request to DCS to shut off PPS and the eddy current braking is initiated. The force of the eddy current braking is as follows:where is the eddy current braking resistance in running direction and can be described as follows:

When the speed decreases to 130 km/h or lower, the wearing plate braking is initiated to make attractive force between the eddy current electromagnet and the side rail of the line increase gradually; is described as

Once the speed of the maglev train decreases to 10 km/h or lower, the gliding skid braking is initiated to make the train stop. where is the gradient per millage, is train weight, is gravitational acceleration, and is friction coefficient of the gliding skid braking and is given by

Moreover, the gradient line forms an additional resistance to the train. The additional gradient resistance is

In addition to the above-mentioned resistances, the curve line adds another additional curve resistance that can be described as follows:

The train-borne equipment energy iswhere is levitation energy, is emergency braking energy, and is vehicle-borne equipment consumption energy.

The train levitation power is

Although the whole deceleration process of the train is variable, the deceleration in a short differential time within can be assumed to remain constant. During , the deceleration is . Therefore, the running distance can be obtained by

3. Vehicle-Borne Battery Condition Sensor Network for Connected Maglev Trains

In this section, the impact of battery conditions on the operation and the monitored battery parameters are analyzed briefly. To share battery conditions for the connected maglev trains, a sensor network and a data exchange method are designed in detail.

3.1. The Impact of Battery Conditions on Maglev Train Operation

The line for the maglev train is divided into four types including station, speed-up area, track with ASA and PR, and track without PR, as shown in Figure 1.

As is shown in Figure 2(a), the train speed is usually lower than 100 km/h in the station and vehicle-borne collectors provide the energy from PR for levitation and vehicle equipment including batteries and other electrical loads. When departing the station, with the power from PR, the train accelerates quickly to exceed the minimum levitation limit. In case of emergency, the train has to be braked to stop within either station or speed-up area. In this case, two possibilities should be evaluated by OCS: if the train can still stop within the speed-up area, an emergency braking should be initiated; if the train can only stop beyond the speed-up area, current operation strategy is kept for certain time and then train is braked to run to the next ASA in the section decentralization.

During section decentralization operation, when train speed is higher than 100 km/h, the vehicle-borne linear generators supply the levitation energy, as shown in Figure 2(b). However, when its speed is lower than 100 km/h, the vehicle-borne batteries provide the levitation energy because vehicle-borne linear generators cannot supply enough energy, as shown in Figure 2(c). Moreover, a stop-point-stepping method is employed to make the train run through ASA until forwarding to next station according to the arranged speed curves. In case of emergency, similar to the situation in the station, two possibilities should be considered: if the train has to stop immediately because of some unexpected emergencies like a maintenance vehicle ahead, the train has to brake with the maximum deceleration; otherwise, the running state and the deceleration process should be adjusted accordingly to make train stop in the next ASA.

3.2. Vehicle-Borne Battery Condition Monitoring

The normal working ranges of lithium batteries in the maglev train are shown in Table 1.

(1) Battery Temperature Monitoring. When discharging rate is too high, battery temperature increases quickly and forms hot air to rise in the tank. Therefore, the temperature sensors should be placed on the upper part of the box to obtain the actual temperature information easily. Using MicaZ modules of MEMSIC Inc., the temperature values and their corresponding conditions are described in Table 2.

(2) Battery Remaining Capacity Monitoring. The voltage and current of the battery are obtained from Vehicle Diagnosis Computer (VDC), and the remaining capacity of the battery can be evaluated to realize the real-time monitoring of remaining capacity. The relationships between remaining capacity and corresponding conditions are shown in Table 3.

(3) Battery Visible Flame Monitoring. In the practical operation, the battery temperature often exceeds the normal limits. Unfortunately, VDC cannot tell whether there is fire or not. The flame sensors can be used to detect the visible battery flame. The relationships between the visible flame and corresponding conditions are shown in Table 4.

3.3. Vehicle-Borne Battery Sensor Network

The parameters indicating the conditions of the vehicle-borne battery include temperature, voltage, and current [2326]. During the train operation, in order to prevent the batteries from overheating, their temperature ought to maintain a safe range. Meantime, voltage and current of each battery should keep at an appropriate level to guarantee the remaining energy for vehicle-borne equipment and train levitation. When a maglev train stops in the station or ASA, its batteries must be checked to remain enough energy to provide its levitation to the next ASA and can perform an emergency braking before its departure.

Each vehicle of the maglev train has eight batteries including four 440 V and four 24 V. Except for emergency-lighting depending on 24 V batteries, almost all train-borne systems including levitation and direction, braking, air-conditioning, and other ones are supplied by four 440 V batteries. Here, we only take four 440 V batteries into consideration. For a typical maglev train with six vehicles, a sensor network based on IoT to monitor vehicle-borne battery condition is shown in Figure 3. The network includes two Vehicle Safety Computers (VSCs) and two Mobile Radio Control Units (MRCUs) for two terminal vehicles and one Data Acquisition Unit (DAU) for each vehicle. In a vehicle, DAU gathers batteries condition data and sends them to VSCs; the master VSC formulates the operation control strategy accordingly (the master VSC is active and the slave one is in hot standby state).

Both head and tail vehicles have 2 directional antennas on top of them to form redundancy communication channels. Connected maglev trains exchange condition data via existing RCS, whose base stations are located along the rail line, as shown in Figure 4.

4. Operation Control Strategy for the Connected Maglev Trains

Considering the train-borne battery conditions, an operation control strategy for the independent maglev train is given in this section. Further, for the connected trains, based on five speed limits as shown in Figure 5, an operation control strategy for the following operation of the connected trains is discussed in detail.

Curve is a minimum speed-up limit used to reach minimum speed, curve is a minimum levitation limit considering running resistance and slope influence, curve is a maximum safety-brake limit considering safe braking characteristics and slope influence, curve is a maximum speed running limit, curve is a maximum speed limit considering the train structure and all line conditions, and curve is actual running speed limit.

4.1. Battery Conditions Based Operation Strategy

Based on the battery parameters including temperature, voltage, current, and visible flame, different operation control strategies are employed to ensure the train operation safety. The battery remaining capacity can be calculated with battery voltage and current [23]. The battery parameters and corresponding operation control strategies are shown in Tables 57.

4.2. Operation Control Strategy for Departure and Pull-In

When the train departs from the station, the energy for levitation and vehicle-borne equipment is supplied by the collectors that are connected to PR. In order to run to the next ASA, all the vehicle-borne batteries have to be evaluated. The operation control strategy is to satisfy the minimum capacity requirement for levitation and emergency braking (at least once). Once the train speed is lower than the minimum levitation limit, PPS will be shut off, making the train float to the nearest ASA in levitation state.

In the pull-in deceleration area, the operation control strategy is to use kinetic and potential energy to run into the station, as shown in Figure 6. During approaching the station, if the initial speed > 100 km/h, the gliding distance and the operation mode switching point (see point A: from constant speed coasting mode to braking deceleration mode) are determined firstly according to (1)–(8) and (13), making the batteries supplied energy minimum in the distance . On the other hand, when the initial speed < 100 km/h, the energy for levitation and other equipment is supplied by the train-borne batteries; the gliding distance with kinetic and potential energy is only from the switching point B obtained in the same way of switching point A. In such case, the operation control strategy is to cut off the power for other train-borne equipment to guarantee the energy supply for levitation and emergency braking.

4.3. Section Operation Control Strategy for the Connected Trains

When connected trains run with the same direction in the same line, the location and speed of the leading train can affect the following train according to the mobile blocking principle. In this case, the leading train is treated as a mobile obstacle for the following train. As shown in Figure 7, to guarantee the safety of the following operation, together with the mobile blocking method and the leading train state, the operation control strategy for the following train is to formulate a speed limit (i.e., speed limit 6) that can satisfy the following interval and also leave a safety margin.

Normally, the following train runs behind the leading one for more than the safety distance. If the leading train decelerates or performs an emergency braking, the following one performs corresponding strategy to prevent it from crashing into the leading one. In the extreme case, when the leading train stops on the line for some reasons, the operation control strategy for the following train is to stop in the ASA that is behind the leading train for at least one safe ASA.

As is shown in Figure 8, during the following operation, if the train-borne batteries of the leading train break down to bring an emergency braking, the following train can obtain the related data through RCS. In this case, two operation control strategies can be formulated to save battery energy of the following train: if the following interval is long enough and the following train cannot stop in the next ASA because of high speed, the following train can accelerate to the maximum speed, coast for a specific distance, and then brake to stop in the ASA that is behind the leading train (see curve (B)); if the current speed is relatively low, the following train is braked to stop in the next ASA (see curve (A)).

5. Simulation and Experimental Results

In this section, a simulation is carried out and an experiment is performed to verify the effectiveness of the proposed operation control strategy and illustrate the applicability of the obtained results. The map of the scenario and the line sketch are shown in Figures 9 and 10; the parameters of the maglev train and the line are described Table 8.

The resistance and corresponding deceleration of the train at different speeds are shown in Figure 11. It can be seen that total deceleration is higher than 1 m/s2. When the train speed is lower than 10 km/h, the deceleration is mainly from the gliding skid. When 10 km/h < < 140 km/h, the eddy current braking provides the main resistance for the train. However, the air resistance and the eddy current braking supply the resistance for the train when > 140 km/h.

The remaining capacity of the vehicle-borne battery is a key factor that affects the operation control strategy formulating. The speed-distance and energy-distance curves under the emergency braking and intrinsic resistance braking are shown in Figures 12 and 13. From Figure 12, the minimum running point and the related energy for levitation and other vehicle-borne equipment can be obtained. When the initial speed is 400 km/h, the braking distance is 2.65 km and the minimum battery capacity for levitation and other train equipment is 4.38 kWh. Meanwhile, the maximum running speed and the corresponding energy can be obtained from Figure 13. During the operation control strategy formulating, any ASA within these two points can be chosen to stop the train.

During the running, if a vehicle-borne battery related emergency happens, based on our proposed operation control strategy, the train can run for a given distance at the constant speed and then the emergency braking is performed to stop the train quickly to consume the battery energy as little as possible. From Figure 14, it can be seen that the train consumes less vehicle-borne battery energy and total running time is shorter at a higher initial speed. In our simulation, the initial speed is supposed to be 400 km/h and the distance from the train location to the stop-point is 2774.5 m according to Table 8. From (1)–(8) and (13), the distance for emergency braking with initial speed 400 km/h is 2651.3 m, leaving 123.2 m for the train running with constant speed at 400 km/h and the total running time is 54.8 s. From (11) and (12), the total energy consumption is 4.47 kWh.

As is shown in Figure 15, during the following operation for the connected trains, if the leading train performs an emergency or decelerates for some reasons, the following train should adjust the operation strategy to prevent it from crashing. Suppose the distance between the two trains is 15 km. Because the minimum braking distance for the initial speed 400 km/h is 2.65 km and the minimum capacity of the train-borne battery is 4.38 kWh, the operation control strategy for the following train is to speed up to 400 km/h, run for about 9.45 km, and then perform a maximum braking to run to an ASA that is behind the leading train for about 3 km (here considering the safety margin of about 3 km). Thus, the safety of the following operation for the connected trains can be guaranteed.

For the connected trains, in case of shutting-off PPS for the following train, the operation control strategy for the following train is to evaluate whether the following interval between the two trains is larger than the floating distance and the train-borne battery capacity is enough to supply the levitation for the floating. If true, the following train can float to the next ASA. As is shown in Figure 16, the energy for floating running of the following train is about 54 kWh, and the floating distance is about 6.6 km. Because the following interval is larger than the floating distance, the following train can float to the ASA between the train location and the farthest floating point.

6. Conclusions

In this paper, considering the vehicle-borne battery condition monitoring, an operation control strategy is proposed to guarantee the operation safety of the connected maglev trains. The condition information of the vehicle-borne battery temperature and remaining capacity is gathered by IoT and collected by OCS via TCN; the connected trains share the condition data through RCS. The following train formulates the operation control strategy in real-time according to train-borne battery conditions and the operation state of the leading train. The simulation and experiment are given to demonstrate the effectiveness of the proposed strategy.

Further investigations could be concerned with operation control strategy formulation for the connected trains considering the state of other vehicle-borne equipment and combining these constraints together.

Conflicts of Interest

The authors declare that there are no conflicts of interest regarding the publication of this paper.

Acknowledgments

This work was supported in part by the Fundamental Research Funds for the Central Universities under Grant 2017JBM017, in part by National Key R&D Program of China under Grant 2016YFB1200601, in part by National Natural Science Foundation of China under Grant 61573504, and in part by National Aerospace Science Foundation of China under Grant 201501M5001.