Research Article

Reuse of Waste Energy from Power Plants in Greenhouses through MAS-Based Architecture

Table 4

Results of Student’s t-test and Levene’s test performed in the case study.

Before platformAfter Platform
MeanStd.MeanStd.tp value (2-tailed)F p value

Greenhouse 1 3077.23 1105.43 854.30 542.90 17.124 p 0.001 40.423 p 0.001

Greenhouse 2 3066.11 1200.02 1067.05 999.61 12.143 p 0.001 8.537 p=0.004

Greenhouse 3 2814.87 1086.98 808.62 466.05 16.093 p 0.001 54.733 p 0.001

Greenhouse 4 2785.09 1046.97 873.86 616.59 14.922 p 0.001 42.147 p 0.001