Research Article
Online Supervisory Control and Resource Management for Energy Harvesting BS Sites Empowered with Computation Capabilities
| Parameter | Value |
| Total BSs, | | Max. number of VMs, | | Min. number of VMs, | | Time slot duration, | min | Operating power, | W | Energy overheads for switching VM, | | Max. computation workload per VM, | MB | Max. allowed processing time, | s | Energy cons. of network interfaces, | J | Cost of exchanging one unit of data, | 6 J/byte | Processing rate set, | | Static energy consumed by VM, | J | Max. energy cons. by VM at , | 10 J | Energy storage capacity, | 490 kJ | Lower energy threshold, | 30% of | Upper energy threshold, | 70% of | Low traffic threshold, | MB |
|
|