Research Article

Intelligent City Traffic Scheduling Optimization Based on Internet of Things Communication

Table 2

Descriptive statistics of main variables.

VariableClarificationMeanStandard deviationMinimum valueMaximum

TPFirst map22781.4874785.2378.021132569.21
GDP59636.549872.454410.186506301.2
FDI0.00330.004600.0564
STE0.01710.01640.00030.2313
IndSecond path50.013911.89129.7387.94
EDU470.4439409.302702409.313
POP0.10260.09440.00231.1448
BUS119.4722113.55251.95401591.47
INNInner path12.4455.650.0061061.27
EMP38.7584.451.13923.2
TECH2.3131.8940.07712.152