Research Article
An Improved Immune Genetic Algorithm for Solving the Flexible Job Shop Scheduling Problem with Batch Processing
Table 8
Detailed processing information on two job types.
| Category A | Category B | Operation number | Operation name | Optional machine sets | Processing time | Operation number | Operation name | Optional machine sets | Processing time |
| 1 | Low voltage winding | 1-3 | 5-7 | 1 | Low voltage winding | 1-3 | 6-8 | 2 | High voltage winding | 4-7 | 6-9 | 2 | Pressing and drying | 8-9 | 3-5 | 3 | Pressing and drying | 8-9 | 4-5 | 3 | High voltage winding | 4-7 | 7-10 | 4 | Remove the mold | 10-11 | 2-3 | 4 | Pressing and drying | 8-9 | 3-4 | 5 | Turn measurement and brush glue | 10-11 | 7-8 | 5 | Remove the mold | 10-11 | 2-3 | 6 | Inspection | 12-13 | 3-4 | 6 | Turn measurement and brush glue | 10-11 | 8-10 | 7 | Coil assembly | 14-20 | 8-10 | 7 | Inspection | 12-13 | 3-4 | 8 | Insert silicon steel sheet | 14-20 | 6-8 | 8 | Coil assembly | 14-20 | 7-9 | 9 | Body assembly | 14-20 | 4-6 | 9 | Body assembly | 14-20 | 4-6 | 10 | Lead assembly | 14-20 | 3-5 | 10 | Lead assembly | 14-20 | 2-5 | 11 | Inspection | 12-13 | 3-4 | 11 | Inspection | 12-13 | 3-4 | 12 | Drying | 21 | 10 | 12 | Drying | 21 | 12 |
|
|