Optimization of Rolling Schedule for Single-Stand Reversible Cold Rolling Mill Based on Multiobjective Artificial Fish Swarm Algorithm
Table 4
Comparison of optimized schedule (Opt.) and empirical schedule (Emp.) for No.2 SPEC.
| Pass | Method | Outlet thickness [] | Reduction rate | Rolling force [] | Power [] | Rolling speed [] | Rolling time [] |
| 1 | Opt. | 2.01 | 0.33 | 8493 | 4496 | 500 | 2.563 | Emp. | 2.10 | 0.30 | 7663 | 3866 | 500 | 2.465 |
| 2 | Opt. | 1.33 | 0.33831 | 8770 | 5876 | 740 | 2.764 | Emp. | 1.37 | 0.35 | 9284 | 5897 | 678 | 2.850 |
| 3 | Opt. | 0.87 | 0.34586 | 8738 | 5831 | 860 | 3.548 | Emp. | 0.87 | 0.36 | 9429 | 5868 | 770 | 3.856 |
| 4 | Opt. | 0.60 | 0.31034 | 7761 | 5876 | 1200 | 3.859 | Emp. | 0.56 | 0.36 | 8598 | 5894 | 1020 | 4.588 |
| 5 | Opt. | 0.39 | 0.35 | 8246 | 5829 | 1200 | 5.839 | Emp. | 0.37 | 0.34 | 8100 | 5540 | 1200 | 6.519 |
| 6 | Opt. | 0.25 | 0.35897 | 8779 | 5644 | 1200 | 8.220 | Emp. | 0.25 | 0.32 | 8279 | 5054 | 1200 | 8.318 |
|
|