Research Article
Low Latency 5G IP Transmission Backhaul Network Architecture: A Techno-Economic Analysis
Table 4
Comparison of number of data center CAPEX, OPEX, and TCO.
| Data center | Capex k$ | Opex k$ | TCO k$ |
| 1 | 249.65 | 128.32 | 377.97 | 2 | 499.3 | 276.64 | 775.94 | 3 | 748.96 | 377.62 | 1,126.58 | 4 | 998.61 | 398.37 | 1,396.98 | 5 | 1,248.26 | 445.4 | 1,693.66 | 6 | 1,411.4 | 492.4 | 1,903.8 |
|
|