Research Article

Cost Estimation Model Using Modified Parameters for Construction Projects

Table 6

Validation results.

Building nameABC
Method(a)(b)(a)(b)(a)(b)

Quantity result
 Reinforced concrete98.4696.1396.56101.8097.3699.46
 Concrete92.4998.91100.95101.08100.0593.94
 Reinforced concrete pouring98.4696.1396.56101.8097.3699.46
 Concrete pouring92.4989.91100.95101.08100.5093.94
 Steel bar86.0576.2399.22113.08101.50105.98
 Steel cutting86.0576.2399.22113.08101.50105.98
 Basement68.2052.28142.55215.48147.26174.87
 Column101.40107.6592.09184.53124.85196.76
 Beam94.98113.9195.30153.38100.97113.21
 Flat slab96.2298.41101.28105.9996.49104.77
 Slope slab95.8899.91132.26183.94132.26185.21
 Inner wall97.0996.86101.98102.53101.60103.26
 Outside wall95.1075.9994.2395.6097.4194.46
 Stair119.16134.36116.55121.50117.38123.78
 Etc.0.00100.0073.670.0073.670.00
 Average accuracy (%)94.4393.14104.98128.21108.29121.08
 Average error rate (absolute value) (%)5.576.864.9828.218.2921.08
 Standard deviation of error rate (%)10.8919.6215.0139.3315.8736.12
Total cost result
 Accuracy (%)94.2090.4298.97107.71100.81104.47
 Error rate (absolute value) (%)5.809.581.037.710.814.47

(a) Proposed model; (b) 1-NN method in CBR.