A Comparative Study of Protective Schemes for Shield Tunneling Adjacent to Pile Groups
Figure 12
Calculated settlement of bridge: (a) deep-hole grouting; (b) pile foundation underpinning; (c) without protection. The values (in red characters) represent the percentage of displacement. For an example, the red area in Figure 12(c) (displacement between −3.77 mm and −4.12 mm) accounts for 0.4% of the total displacement of the bridge.
(a) |
(b) |
(c) |