Research Article
Performance of Super-Large-Span Tunnel Portal Excavated by Upper Bench CD Method Based on Field Monitoring and Numerical Modeling
Figure 4
Construction of upper bench CD method. (a) Field construction. (b) Three-dimensional schematic diagram.
(a) |
(b) |