Research Article

Performance of Super-Large-Span Tunnel Portal Excavated by Upper Bench CD Method Based on Field Monitoring and Numerical Modeling

Figure 4

Construction of upper bench CD method. (a) Field construction. (b) Three-dimensional schematic diagram.
(a)
(b)