Abstract

The number of super-large-span tunnels is increasing in both new construction and reconstruction projects in China recently. In super-large-span tunneling engineering, the deformation properties and mechanical behaviors of tunnel portal structure are more complex than those of common tunnel due to the flatter shape and larger construction span. The mechanical behaviors of rock mass change in response to different sequential excavation methods and supporting parameters. The upper bench CD method has been gradually applied in the construction of super-large-span tunnels in China. In this paper, the design parameters for the supporting structure of super-large-span tunnel were studied by the field monitoring and numerical modeling in a case study of Laohushan tunnel. It was found that the crown settlement was larger than the clearance convergence, and the stress of arch was greater than that of the side wall in tunnel portal section. The invert structure was flat with small curvature. Therefore, the shotcrete was mainly subjected to tensile stress. The use of H200 × 200 steel rib with spacing of 60 cm and C25 shotcrete with thickness of 30 cm is recommended. The results of this paper provide basis for the development of design specifications and construction standards for super-large-span tunnels and provide reference for similar projects in the future.

1. Introduction

With the rapid development of national economy and the gradual growth of highway transportation volume, the existing single-hole two-lane tunnels are unable to meet the needs of transportation and travel in the economically developed areas and suburban megacities [18]. Considering that the route corridor is nonrenewable, there are more and more single-hole four-lane tunnels in newly built highway and reconstruction projects. However, there is no rich experience in design and construction of super-large-span highway tunnels in China engineering industry. In addition, there is no system standard for the construction of super-large-span highway tunnels, and the design principle of engineering analogy is still in use in the design of two-lane or three-lane tunnels. There are many kinds of supporting forms of tunnel portal section, for example, primary supporting with two-layer secondary lining, two-layer primary supporting with high-strength secondary lining, and high-strength primary supporting with secondary lining. Moreover, there is no national standard for design parameters and construction methods. Shi et al. proposed a method for determining the minimum burial depth of tunnels by considering reinforcement control measures, and a large-span tunnel with excavation area of 376 m2 was excavated successfully [911]. In the research of tunnel supporting parameters, based on geotechnical engineering inversion theory, the reasonable supporting parameters were proposed by comparing the supporting parameters with the optimized supporting parameters in tunnel project [1215]. A reasonable supporting method of four-lane highway tunnels was proposed by simulating the structural form and supporting parameters of super-large-span tunnels [1619]. A reasonable supporting form for special strata was proposed by combining numerical simulation and on-site monitoring data [2026]. However, the design parameters of super-large-span tunnel supporting structure were mainly studied for single-supporting parameter in a single-stratum environment through numerical simulation or model test. The applicability of research results could not be widely used.

The New Austrian Tunneling Method is being widely used in China because it is simple, cost-effective, adaptive, and technically feasible [2731]. Sequential excavation method (SEM) is widely used in super-large-span tunnels, which reflects the design concept of the New Austrian Tunneling Method. Even though great engineering construction achievements were made in terms of the construction of super-large-span tunnels using SEM, there are limited number of related studies on this topic in international journals [3235]. Gong et al. (2009) studied the settlement of vault and ground surface under different construction methods such as double-sided guide tunnel method, central diaphragm (CD) method, and upper-lower bench method using finite element software based on the large cross section tunnel in Heshang [31]. Jiang et al. established the discrete element numerical analysis model and optimized the construction method of super-long-span tunnel in a case study of Kuiqi No. 2 tunnel project [36]. Gao et al. used finite element software to study the construction of tunnel by using double-sided guide tunnel method, CD method, and cross diaphragm (CRD) method based on Liantang Tunnel [37]. Through field tests, Zhou et al. proposed that the excavations of first heading in the upper bench o, the second heading in upper bench, and the core soil are the key points to be controlled in the tunnel construction when the both-side heading method is adopted in a case study of Longtoushan Tunnel [38]. Relying on the Dadongshan Tunnel, Zhang studied the deformation of surrounding rock in the excavation of tunnel grade IV by CRD method and grade V by double-sided pilot pit method, through field monitoring and measurement [27]. Li et al. proposed to study the deformation of surrounding rock and the stress of supporting structure of the tunnel during construction with double-sided guide pit method and CD method through field tests, relying on the No. 1 tunnel project of Qichong Village, Guiyang [39]. From the above research on the construction methods of large-span tunnels, it can be seen that the sectional excavation method has been widely used [40], and the upper bench CD method has been less applicated in the construction of large-span tunnels.

In this paper, based on the Laohushan Tunnel with super-large span of 20.008 m, the mechanical characteristics and supporting parameters of supporting structure near tunnel portal were studied and analyzed through on-site investigation and field test monitoring in the construction process of Laohushan super-large-span tunnel. At the same time, this paper uses the method of numerical simulation to analyze and calculate the primary supporting internal force and material safety factor to verify the safety and applicability of design support parameters in tunnel portal section. This paper provides project analogy method reference for the construction of similar projects in the future, as well as the formulation of specifications and standards for super-large-span highway tunnels in China.

2. Project Overview

This paper takes the Jinan Belt Highway tunnel groups as the supporting project and selects the Laohushan Tunnel as the research object. Laohushan Tunnel is located in Jinan City, Shandong Province, China. The tunnel is designed as two holes with four lanes in single hole. The left line is 1740 m, the right line is 1888 m, and the maximum excavation span is 20.008 m, which belongs to super-large-span highway tunnel. The stratum of tunnel portal section is the paleoweathering crust of the Lower Ordovician (O1) of Paleozoic, and the lithology is the pale-yellow residual gravel soil and the gravel block soil. The stratum structure is compact, the cementing property is good, and the soil layer is hard, but it is easy to soften when exposed to water. The tunnel location and the landform of tunnel site are shown in Figures 1 and 2, respectively.

2.1. Primary Supporting Structure Parameters

The primary supporting structure parameters (H200 × 200 steel rib with spacing of 60 cm, C25 shotcrete with thickness of 30 cm) were first selected according to the engineering analogy. The composite lining structure is adopted in the supporting form of Laohushan Tunnel and the supporting parameters of tunnel portal section are shown in Figure 3. The support system of tunnel portal is shown in Table 1.

2.2. Construction Approaches

The upper bench CD method was adopted in the construction of tunnel portal as shown in Figure 4.

The construction procedures of upper bench CD method are as follows:(a)Excavate the upper bench part 1 and timely construct structure II and the upper part of structure I(b)When part 1 is excavated 15–20 m ahead of part 2, excavate part 2 of the upper bench and construct the upper part of structure III in time(c)When part 2 is excavated 20–30 m ahead of part 3, excavate part 3 of the left and right lower guide pits and construct the lower part of structures I and III in time(d)Remove temporary support II, excavate part 4, timely construct support structure IV of invert, and fill lower part V of invert secondary lining(e)Construct superstructure V of secondary lining

3. Numerical Simulation

Based on the above supporting parameters, the numerical calculation was carried out by MIDAS-GTS to obtain the deformation properties and mechanical behaviors of tunnel structure. In the numerical model, the supporting effect of presupports, systematic bolts, and locking bolts (tube) was simplified as the reinforcement area (the cohesive force and friction angle of the original rock were enhanced by 20% [39]). The primary supporting was simulated as the beam element, and the physical parameters were obtained by the equivalent reduction of steel rib and shotcrete, which was in accordance with the “Unified Theory of CFST” [41]. After the equivalent reduction, the physical parameters were selected as the modeling parameters of primary supporting. In this paper, the comprehensive safety factor method in the “Guidelines for Design of Highway Tunnel” [42] was used to check and evaluate the primary supporting of super-large-span highway tunnel. According to (1) to (4), the total axial force and total moment assumed by the primary supporting are undertaken together by the steel rib and shotcrete:where N, M are the total axial force and total moment of checking section in unit length (kN, kNm); Ah, are the area of calculation section of shotcrete and steel rib (m2); Eh, are the elastic modulus of shotcrete and steel rib (kPa); Nh, are the axial force of shotcrete and steel rib (kN); and Mh, are the moment of shotcrete and steel rib (kNm).

When the strength of shotcrete and steel rib was checked by the comprehensive safety factor method, it should meet the stipulation of (5) to (6). The formulas are shown as follows:where Rhy is the ultimate compressive strength of steel rib (kPa); Rgy is the ultimate compressive strength of steel rib (kPa); Rgl is the ultimate tensile strength of steel rib (kPa); Khy is the comprehensive safety factor of compressive strength of shotcrete; is the comprehensive safety factor of compressive and tensile strength of steel rib; is the bending strength of steel rib checking section (m3); and α is the eccentric influence coefficient.

The excavation section width of the model was 20 m, and the upper distance of the tunnel portal model took the actual rock mass height. The horizontal distance of the model took 3 times the tunnel diameter (20 m), the horizontal direction constraint was applied to the left and right sides of model, and the vertical direction constraint was applied to the bottom boundary of model. The initial ground stress only considered the effect of self-heavy stress. Rock mass was considered an ideal elastic material, subjected to the Mohr–Coulomb yield criterion. The lining structure adopted an elastic model, and the lining structure adopted a beam unit. The physical and mechanical parameters of rock mass used in the modeling are shown in Table 2, and the finite element model is shown in Figure 5.

The simulated deformation results of tunnel portal section are shown in Figure 6. The simulated crown settlement value is 19.7 mm, and the horizontal convergence is 7.8 mm. The overall deformation of structure is small, far less than the ultimate displacement value of 200 mm.

The 12 monitoring points were selected to analyze the structural stress and safety factor. The structure was calculated according to the method of internal force and safety factor in the “Design Rules for Highway Tunnels” [42]. The results were shown in Table 3.

The arch stress of primary supporting was slightly larger than that of side wall and invert. The maximum axial force (2472 kN) of shotcrete appears at 60° left of center of arch, and the safety factor was 2.7. The maximum bending moment (−8.2 kN m) of steel rib appeared on the right arch foot and side wall, with safety factor of 4.2. According to the “Design Rules for Highway Tunnels” [38], the safety factors of steel rib and shotcrete under the basic variable combination of QZH-II were 2.0 (compression/tensile), 3.6 (tensile), and 2.4 (compression/tensile). The safety factor of the primary support structure of tunnel portal section was larger than the specified value. It showed that the design parameters could meet the structural safety. The results indicated that the secondary lining was less stressed and could be used as safety stock.

4. Field Monitoring

4.1. Monitoring Scheme

Test sections were selected to conduct deformation and stress monitoring near tunnel portal section based on the engineering geological conditions and the construction characteristics of Laohushan Tunnel. Monitoring tunnel deformation is an important method to obtain the deformation law of tunnel, and it could further guide the construction [26]. Shen (2014) conducted extensometers and stressmeters to measure the deformation and the stress change in the rock mass based on mine tunnel road [43]. The three deformation monitoring sections were selected in YK2 + 125, YK2 + 133, and YK2 + 140, among which YK2 + 133 was also the stress monitoring section. The monitoring sections were shown in Table 4 and Figure 7. The layouts of deformation and stress monitoring points are shown in Figure 8. The stress monitoring points are named as follows: “element + layout number + position number”. The positive value means compression, and the negative value means tension.

4.2. Deformation Properties
4.2.1. Horizontal Convergence

As can be seen from Figure 9, the average value of convergence was 11 mm. After the inverted arch construction, the final convergence rate was less than 0.1 mm/d. The trend of the convergence of arch and the waist portion of wall was basically consistent with time. The stress of rock mass was gradually released after the excavation of first pilot tunnel. The convergence of first pilot tunnel increased rapidly with time, and the stress release of rock mass after the second pilot tunnel excavation was small. The convergence of tunnel increased slowly and tended to stabilize 50 days later. The lower tunnel excavation and the removal of the temporary support had little effect on the tunnel convergence, which indicated that the primary support structure can effectively restrain the deformation of rock mass and the supporting structure was safe and reliable.

Compared with the numerical simulation results, the field monitoring displacement value (11 mm) is slightly smaller than the simulated value (13.3 mm). The field monitoring points were laid out at the same time during the primary support construction. Therefore, the measured deformation value loss is small, and it is closer to the displacement value.

4.2.2. Crown Settlement

As shown in Figure 10, the maximum crown settlement (points 1 and 5) is 19.7 mm, and the maximum settlement at the arch waist (points 2 and 6) is 15 mm. After the inverted arch construction, the maximum settlement value and the final settlement value of crown and arch waist are basically the same, and the final settlement rate of arch is less than or equal to 0.1 mm/d. It can be seen from Figure 10 that the variation of settlement over time in the arch after tunnel excavation is basically the same. Because the stratum was residual soil with high degree of cementation, the settlement of arch increased slowly in the initial stage of excavation. The settlement began to stabilize 20 days later. The lower tunnel excavation, the temporary support removal, the inverted arch construction are all applied after the temporal curve tends to be stable, and the application of these processes has no significant influence on the temporal curve of settlement. Due to the influence of blasting vibration and other factors during the construction process, the data showed slight jitter, but the overall remained stable. This shows that the primary supporting structure can effectively restrain the deformation of rock mass, and the supporting structure is safe and reliable.

4.3. Mechanical Characteristics
4.3.1. Shotcrete Stress

The monitoring stress distribution of shotcrete is shown in Figure 11, and the stress temporal curves are shown in Figure 12.

As shown in Figures 11 and 12, the stress distribution of shotcrete in the test section was uneven, and the shotcrete was mainly subjected to tension. This phenomenon was related to the tunnel section form, indicating that the tunnel flat ratio needs to be optimized.

The maximum compressive stress was 1.98 MPa appearing at the bottom of the invert (point 11), which met the requirements of the ultimate compressive strength of shotcrete. The maximum tensile stress (2.61 MPa) occurred at the right arch wall (point 7), followed by the right arch (point 4) 2.44 MPa, which was greater than the tensile strength (1.3 MPa) of C25 shotcrete. However, according to on-site observation, there was no cracking in the shotcrete and the lining structure can be considered safe.

In primary stage, shotcrete is mainly squeezed and then develops into tension state. The stress increased rapidly after the shotcrete was constructed, and the structural stress tended to be stable about 30 days after the secondary lining was completed. The excavation of lower pilot tunnel and the removal of the temporary supporting structure did not have obvious influence on the overall structure. After a short-term increase in the stress of the shotcrete of most parts of the primary supporting, it tended to stabilize slowly after the secondary lining was applied, except that the shotcrete at the invert arch decreased slowly. This phenomenon was related to the hydration heat of the secondary lining concrete consolidation.

4.3.2. Steel Rib Stress

The stress distribution of steel rib is shown in Figure 13 and the stress temporal curves are shown in Figures 1416.

Note. A is the first pilot tunnel excavation; B is the second pilot tunnel excavation; C is the lower tunnel excavation; D is the removed temporary support; E is the inverted arch construction; F is the secondary lining construction.

Figures 1416 show that the stress distribution of steel rib in the test section was uneven, and the stress distribution of stabilized steel rib was consistent with the maximum stress distribution. The steel rib was mainly subjected to compressive stress, and the force of right steel rib was slightly larger than the left side. The maximum compressive stress of the outside of steel rib was 85 MPa appearing at the arch (point 0), which accounted for about 23% of the ultimate yield strength of steel (375 MPa). The maximum compressive stress of the inside of steel rib was 67 MPa appearing at the right side of hance (point 3), which accounted for about 18% of the ultimate yield strength of steel. The overall stress of steel rib is small and the structure is safe and reliable.

The stress of the temporary supporting was mainly compressive stress, and the inside of arch foot was mainly subjected to tensile stress. The maximum compressive stress was 160 MPa appearing at the arch (point A), which accounted for about 43% of the ultimate yield strength of steel. The maximum tensile stress was 273 MPa appearing at the bottom (point C), which accounted for about 73% of the ultimate yield strength. The stress of temporary supporting was relatively large. After the excavation of rear pilot tunnel, the stress of steel rib is abruptly affected by the blasting vibration. Slight yield of temporary supporting steel rib and concrete spalling could be observed in the construction site. With the excavation of rear pilot tunnel, there was no obvious change of steel rib stress. It can be considered that the temporary supporting steel rib structure is safe and can meet the structural safety requirements.

The stress of the inside and outside of primary supporting steel rib was basically consistent with time. After the construction of primary supporting, the stress of steel rib was rapidly increased and tended to be stable after a week. Due to the construction of lower pilot tunnel, the large free face of arch foot on both sides caused a sudden change in the stress of the steel rib of arch foot, and the stress restored stability after the construction of side wall. The strength of arch steel rib increased in a short period of time and then slowly decreased because of the effect of the self-weight and hardening heat of secondary lining. The primary supporting tended to be stable about 20 days after the completion of secondary lining.

4.3.3. Secondary Lining Steel Stress

The stress distribution of secondary lining steel is shown in Figure 17, and the stress temporal curves are shown in Figures 18 and 19.

As can be seen in Figures 1719, the secondary lining steel was mainly subjected to compression. After stabilization, the partial position of the invert and the side wall was in tension state. The stress of the internal steel of secondary lining was slightly larger than that of the outer steel. The stress on the right side wall (outside stress) and the invert was slightly larger than that of the arch. The maximum compressive stress occurred on the left side wall (point 7), and the value was 44 MPa, which accounted for about 11% of the steel yield strength. The steel stress on the right side (inside stress) of the secondary lining was slightly larger than that of the left side. The maximum compressive stress value occurred on the right side of the invert (point 9), and the value was 54 MPa, which accounted for about 14% of the steel yield strength. The maximum tensile stress value (46 MPa) appeared on the left side wall (point 7), which accounted for about 12% of the steel yield strength. This indicated that the secondary lining steel worked well and had sufficient safety reserve.

The change law of the inside and outside steel of secondary lining was consistent. The stress of steel in the invert had a tendency to transition from compression to tension after the invert construction of secondary lining. The overall stress of secondary lining steel changed slowly and tended to be stable about 30 days after the construction of secondary lining.

4.3.4. Concrete Stress of Secondary Lining

The stress distribution of secondary lining concrete is shown in Figure 20, and the stress temporal curves are shown in Figures 21 and 22. According to Figures 2022, the inside and outside stress of secondary lining concrete were basically similar. The arch crown and the invert were in tension state, and the rest were subjected to compression. The inside stress of the secondary lining concrete was slightly larger than the outside one. Especially for the invert, the tensile stress was large, and tensile stress occurred at the arch but the value is small. It could be considered that the phenomenon was caused by the small flat ratio of super-large-span tunnel, the small curvature of invert, and shallow excavation depth, as well as the self-weight of concrete.

The maximum tensile stress (1.64 MPa) of the outside of secondary lining concrete occurred at the invert (point 9, point 11), which was less than the standard tensile value of C30 concrete of 2.01 MPa. The maximum compressive stress (2.30 MPa) occurred in the right side of hance (Point 4), which only accounted for about 12% of the compressive strength standard value of C30 concrete. The maximum tensile stress (3.22 MPa) of secondary lining concrete (internal) occurred at the right side of invert (point 10), which was greater than the standard tensile value of C30 concrete of 2.01 MPa. However, there was no obvious on-site concrete cracking phenomenon. It is considered that the structure is safe and reliable, and the maximum compressive stress (2.12 MPa) occurred at the right arch foot (point 4).

The stress of inside and outside secondary lining concrete was basically consistent. After the construction of secondary lining, the stress in the invert began to increase rapidly. With the consolidation of concrete, the stress decreased gradually, and there was a transition tendency from compression to tension. The tensile of invert gradually increased, and the compression of the remaining parts increased slowly. The stress of secondary lining changed slowly and tended to be stable 30 days later.

4.4. Comparison between Simulation and Field Monitoring

In the simulation hypothesis, the physical and mechanical parameters were assumed to be homogeneous in the rock mass, and the rock mass was assumed to be elastoplastic material, which would lead to slight differences between the simulation results and field monitoring results in individual parts. The structural stress and the deformation properties are basically consistent with the deformation and mechanical characteristics of support structure presented by the field monitoring data.

5. Conclusion

Through analysis of the deformation, mechanical characteristics, and design parameters of the supporting structure of super-large-span highway tunnel, the main conclusions were drawn as follows:(1)The numerical simulation of tunnel portal of Laohushan tunnel was carried out using MIDAS-GTS to obtain the deformation properties and mechanical behavior under the supporting of H200 × 200 steel rib with spacing of 60 cm and C25 shotcrete with thickness of 30 cm. The results showed that the overall deformation was small, and both shotcrete and steel rib could meet the structural safety requirements.(2)The primary supporting structure of the tunnel portal of Laohushan tunnel could meet the structural stress requirements by field monitoring. The curvature of the invert was small and the overall shape of tunnel was flat, so the shotcrete was mainly subjected to tension and the tension of the invert was more significant. The steel rib was mainly subjected to compression, and the load was small. The removal of temporary support and the construction of secondary lining have an impact on the structural stress, and the remaining construction procedures have less impact on the primary support. Affected by the section form and hydration heat, the tensile stress of arch and invert of secondary lining of tunnel portal was large. The secondary lining steel was mainly subjected to compression with small value. The overall structural force tended to be stable 30 days after the construction of secondary lining.(3)The analysis results of the numerical simulation are basically consistent with the deformation and mechanical characteristics of support structure presented by the field monitoring data, which also satisfied the structural safe requirements, indicating that it is reasonable to adopt supporting structure of H200 × 200 steel rib with spacing of 60 cm and C25 shotcrete with thickness of 30 cm in the construction of super-large-span tunnel portal section.

Data Availability

The data used to support the findings of this study are available from the corresponding author upon request.

Conflicts of Interest

The authors declare that they have no conflicts of interest regarding the publication of this paper.

Acknowledgments

The authors would like to acknowledge the financial support provided by the National Key R&D Program of China (Grant no. 2018YFB1600100), the National Natural Science Fund Project of China (Grant no. 51978065), the China Postdoctoral Science Foundation (Grant no. 2016M602738), and the Chang Jiang Scholars Program (Grant no. Q2018209).