Performance of Super-Large-Span Tunnel Portal Excavated by Upper Bench CD Method Based on Field Monitoring and Numerical Modeling
Table 1
The support system of the tunnel portal.
Temporary support
φ50 × 5 pregrouting pipe: first row L = 6 m, angle = 6°; second row L = 3m, angle = 15°; circumferential spacing = 40 cm, longitudinal spacing = 1.2 m.