Research Article

Estimation of the Pumping Pressure from Concrete Composition Based on the Identified Tribological Parameters

Figure 3

Components of the tribometer and test procedure: (a) tribometer set up; (b) measurement at Step 1; and (c) measurements at Step 2 as proposed by Ngo [18].
(a)
(b)
(c)