Construction Technique of Long-Span Shallow-Buried Tunnel Considering the Optimal Sequence of Pilot-Tunnel Excavation

Table 1

Parameters of surroundings and supporting system.

Parameter typeElastic modulus (MPa)Poisson’s ratioInternal friction angle (Celsius degree)Cohesion (kPa)Density (kg/m3)

Miscellaneous fill3.10.3512.08.01929
Clay5.00.3322.520.51918
Gravel soil230.1830.05.02041
Gabbro eluvial soil7.00.3226.415.01939
Large pipe shed20000.23000
Supporting structure280000.22549