Cu, Cr, and As amounts in utility poles inspected in 4 study areas.

LocationPole ageDecay hazard classes3Cr %Cu %As %Ret.4 kg/m3
Avr.StdAvr.Std.Avr.Std.

Area I15–2030High >700.9500.2730.2110.0870.2850.0926.40
Area II15–2230Moderate 35–701.091 0.2690.2710.0100.3000.0707.35
Area III12–2230Moderate 35–701.0170.2740.2500.0210.2900.0666.88
Area IV18–2430Low 35<1.0820.2550.2900.0630.3680.0837,70
Retention1 (control)100.9990.0660.4130.0140.7580.0829.60

Min required retention (9.6 kg/m3).
Number of poles inspected.
Calculated based on Scheffer’s formula.
Calculated value based on the formula given in the AWPA Standard.