Research Article

An Advanced Process of Condensation Performance Evaluation by BIM Application

Table 2

Comparison of working time between the traditional and advanced CPE processes.

PhaseDescriptionTraditional CPE process (working time, min)DescriptionAdvanced
CPE process (working time, min)

()Planning in 2D-CADDefine expected area of condensation10Planning in 2D-CADDefine expected area of condensationSame as left-hand side
Additional setting works20Additional setting works1

()Modeling in simulation softwareInsert grid values10Use of BIM applicationSelecting a point to place “cube box” 1
Insert min and max values of blocks10
Insert property information10Extracting data and converting to 1

()Run simulation in simulation software1Run simulation in simulation softwareSame as left-hand side

()Calculate temperature factor1Calculate temperature factorSame as left-hand side