Research Article
An Advanced Process of Condensation Performance Evaluation by BIM Application
Table 2
Comparison of working time between the traditional and advanced CPE processes.
| Phase | | Description | Traditional CPE process (working time, min) | | Description | Advanced CPE process (working time, min) |
| () | Planning in 2D-CAD | Define expected area of condensation | 10 | Planning in 2D-CAD | Define expected area of condensation | Same as left-hand side | Additional setting works | 20 | Additional setting works | 1 |
| () | Modeling in simulation software | Insert grid values | 10 | Use of BIM application | Selecting a point to place “cube box” | 1 | Insert min and max values of blocks | 10 | Insert property information | 10 | Extracting data and converting to | 1 |
| () | Run simulation in simulation software | | 1 | Run simulation in simulation software | | Same as left-hand side |
| () | Calculate temperature factor | | 1 | Calculate temperature factor | | Same as left-hand side |
|
|