Experimental Investigation of Laws during Deformation of Circular Roadway in 10° Inclined Layered Rock

Table 3

The loading plan of the physical model experiment.

Load levelSimulated depthLateral pressure coefficientOil pressureDurationThe cumulative recording time
Top pressure/MPaLateral pressure/MPa

Preloading0.40.412 hours0 min

1200 m10.60.6Loading: 15 min
Stabilization: 15 min
15 min
30 min

2400 m11.01.0Loading: 15 min
Stabilization: 15 min
45 min
60 min

3600 m11.61.6Loading: 15 min
Stabilization: 15 min
75 min
90 min

4800 m12.02.0Loading: 15 min
Stabilization: 15 min
105 min
120 min

Excavation of the roadwayThe first stepExcavation: 14 min
Stabilization: 17 min
134 min
151 min
The second stepExcavation: 22 min
Stabilization: 17 min
173 min
190 min
The third stepExcavation: 37 min
Stabilization: 11 min
227 min
248 min
The fourth stepExcavation: 46 min
Stabilization: 17 min
294 min
311 min
The fifth stepExcavation: 24 min
Stabilization: 16 min
335 min
351 min

58001.222.4Loading: 17 min
Stabilization: 13 min
368 min
381 min

68001.422.8Loading: 17 min
Stabilization: 13 min
398 min
411 min

78001.623.2Loading: 17 min
Stabilization: 13 min
428 min
441 min

88001.823.6Loading: 4 min445 min