Research Article
Asphalt Concrete Overlay Optimization Based on Pavement Performance Models
Table 6
APT facility technical parameters.
| Technical parameters |
| Facility | Accelerated pavement testing facility | Construction | Semimobile, linear | Type | 105-03-01 | Maximum velocity | 2.22 m·s−1 | Load | 57.5 kN | Max acceleration | 2 m·s−2 | Max deceleration | 5 m·s−2 | Location | Indoor | Operational temperature | 10–40°C | Operational humidity | 30–80% without condensation | Engine power | 45 kW | Transition | CLP HC VG 320, MOBIL SHC GEAR 320 | Energy requirements | 3 + N + PE, AC, 50 Hz, 230/400, V, TN-S |
|
|